The shingles went on, Monday, March 1. Someone was still on the roof, finishing up, when I left at 6:45 PM.

On March 2nd they continued to work on the roof and did some framing for the new walls. They removed a window and boarded it up on the 3rd.

Friday Troy and I had our first disagreement. The electrician had placed the switches for the room four feet away from the door. This was what was specified on his drawing but I was certain that was not what I had told Robert when we were drawing up the contract. In fact, I'm pretty sure I specified where I wanted the switches for the light and fan. It was NOT where the electrician put them.

That evening I looked at my contract papers and, sure enough, on the drawings which I approved, the light switches for the fan and light were beside the doorway - just where I had requested. Someone decided to change their location without clearing it with me first. But at least I knew the error was not mine.